
Mathematics, 06.11.2019 19:31 lazymarshmallow7
The great pryamid of giza has a square base with both sides of length 756 feet. the height used to be 481 feet before erosion. workers of the pyramid could move and place 12,500 cubic feet of stone per day onto the pyramid. at the given work rate, how long did it take to complete the pyramid in years.

Answers: 1


Another question on Mathematics

Mathematics, 21.06.2019 16:00
Josephine has a great garden with and area of 2x2 + x - 6 square feet
Answers: 2

Mathematics, 21.06.2019 16:30
Iwant to know what 3g+5h+4g-2h is my teacher is too selfish to tell us
Answers: 1

Mathematics, 21.06.2019 16:30
Sam claims that cos x =sin y if x and y are congruent angels. is sam correct ?
Answers: 2

Mathematics, 21.06.2019 21:40
Question 1 of 10 2 points different groups of 50 graduates of an engineering school were asked the starting annual salary for their first engineering job after graduation, and the sampling variability was low. if the average salary of one of the groups was $65,000, which of these is least likely to be the average salary of another of the groups? o a. $64,000 o b. $65,000 o c. $67,000 o d. $54,000
Answers: 2
You know the right answer?
The great pryamid of giza has a square base with both sides of length 756 feet. the height used to b...
Questions


Mathematics, 14.07.2020 20:01

Mathematics, 14.07.2020 20:01



Social Studies, 14.07.2020 20:01

Mathematics, 14.07.2020 20:01

Mathematics, 14.07.2020 20:01

Mathematics, 14.07.2020 20:01










Mathematics, 14.07.2020 20:01